The River’s Edge Trail on the north shore near Black Eagle Dam will be closed from Wednesday, June 4 through Friday, June 6.
The closure is needed so crews can safely use heavy equipment to pour concrete as part of the Black Eagle Dam Spillway Project.
During this time, North River Road will be reduced to one lane near the work area. Drivers should watch for signs and use caution.
The project includes installing new support structures and spillway components to strengthen the dam and improve safety.
For more details, visit: https://fpc-go.com/bok